Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 19, 2006 FBO #1819
MODIFICATION

Z -- Construction Manager as Constructor (CMc) Services

Notice Date
8/25/2006
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Office of Property Development, Rm 3512 (5PE), 230 South Dearborn Street, Room 3512, Chicago, IL, 60604
 
ZIP Code
60604
 
Solicitation Number
GS05P06GBC3025
 
Response Due
9/1/2006
 
Point of Contact
Bobbie Tyler, Contracting Officer, Phone (312)886-7875, Fax (312)886-4103, - Anthony Nowakowski, Project Specialist, Phone 312-353-7630, Fax 312-353-1491,
 
E-Mail Address
bobbie.tyler@gsa.gov, anthony.nowakowski@gsa.gov
 
Description
PLEASE NOTE THAT THE RELEASE OF THE REQUEST FOR PROPOSAL HAS BEEN CHANGED FROM AUGUST 4, 2006 TO ON OR ABOUT AUGUST 17, 2006, VIA THE FEDTEDS WEBSITE. Z -- Construction Manager as Constructor (CMc) Services General Information Document Type: Presolicitation Notice Solicitation Number: GS-05P-06-GB-C-3025 Posted Date: July 28, 2006 Original Response Date: September 1, 2006 Current Response Date: September 1, 2006 Original Archive Date: November 30, 2006 Current Archive Date: November 30, 2006 Classification Code: Z- Maintenance, repair, and alteration of real property Naics Code: 236220 – Commercial and Institutional Building Construction Contracting Office Address: General Services Administration, Public Buildings Service (PBS), Office of Property Development, 230 South Dearborn Street, Suite 3600, Chicago, IL 60604 Description: Construction Manager as Constructor (CMc) Services: The General Services Administration (GSA) Great Lakes Region announces an opportunity for Construction Manager as Constructor (CMc) Services related to the modernization and renovation at the Minton-Capehart Federal Building, located in downtown Indianapolis at 575 North Pennsylvania, Indiana. Built in 1974, the Minton-Capehart Federal Building is a freestanding six story building with a Ground Floor below grade, with a mechanical mezzanine above grade, and a penthouse above the core area of the Sixth Floor. Attached to the building is a two level parking facility. It is the intention in this design and construction renovation project is to respect the Modern Era “Brutalist” Design of the building, even though the building is not yet currently listed on the National Historic Register. The estimated construction cost ranges is $19 million to $30 million. The construction portion of the project is estimated to begin in April 2009. The scope of CMc services under this proposed contract includes the base contract for Pre-Construction Phase Services with the Construction Phase Services of the project evaluated as a Guaranteed Maximum Price (GMP) option. This will be a firm, fixed-price contract. A firm, fixed-price for the general construction services will be negotiated prior to exercising the Construction phase option. Project Summary: Continuing a legacy of outstanding public architecture, this project will be executed based on GSA’s Design and Construction Excellence Program. The scope of this project, as it relates to the planned modernization and renovation work will most likely included, but not be limited to, the following: (1) refurbish the air-handling units for greater airflow to provide the recommended minimum amount of fresh air for each occupant and improve the total air circulation; (2) replace the fiberglass branch distribution ductwork and diffusers to handle greater airflows and to eliminate contamination from glass fiber in the environmental air, (3) replace the stair pressurization fans with larger fans that will produce the necessary pressures and airflows; (4) provide a new direct digital control (DDC) temperature control system for energy efficiency; (5) provide additional commissioning of the system and other improvements for LEED-EB certification; (6) utilize the existing dry standpipe risers in the stairs as a part of a new sprinkler system; (7) provide sprinkler protection extending from the mains to each space in the building; (8) provide a new fire pump and jockey pump, installed in the Ground Floor mechanical room, to boost the pressure for the new sprinkler system; as well as (9) provide new lay-in ceilings, repair hard ceilings and replace lighting throughout the building with modular wiring and automatic controls for lower maintenance costs, easier adds and moves, as well as provide for greater energy efficiency. Possible additional design work (Option1 1) and additional construction work (part of Option 2) may include the repair of the existing parking garage NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (25-AUG-2006). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 17-NOV-2006, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/GSA/PBS/5PCI/GS05P06GBC3025/listing.html)
 
Place of Performance
Address: 575 North Pennsylvania Indianapolis, IN
Zip Code: 46204
Country: UNITED STATES
 
Record
SN01183586-F 20061119/061117223717 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.