Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 07, 2006 FBO #1776
MODIFICATION

20 -- Boat and Trailer Repair

Notice Date
8/10/2006
 
Notice Type
Modification
 
NAICS
336612 — Boat Building
 
Contracting Office
Other Defense Agencies, U.S. Special Operations Command, Naval Special Warfare Group 4, 2220 Schofield Road, Norfolk, VA, 23521
 
ZIP Code
23521
 
Solicitation Number
H92242-06-T-0017
 
Response Due
8/21/2006
 
Point of Contact
Ruby Phillips, Purchasing Agent, Phone 757-492-1341, Fax 757-492-1343,
 
E-Mail Address
Phillips_R@nsweast.socom.mil
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation, H92242-06-T-0017 is issued as a request for quotation (RFQ) and this is notice that NSWG4 Contract Office, NAB Little Creek, Norfolk Va intends to award a Firm Fixed Price contract. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-09. The associated NAICS code is 336612 and small business size standard is 500. Line item 0001 Provide Boat and Trailer Repairs in accordance with the Specification Document cited below. Note that you must be registered in the Central Contractor Registration system to be considered for the award. Registration is free and can be completed online at http://www.ccr.gov The provision at FAR 52.212-1 -- Acquisition of Commercial Items Provisions and Clauses applies to this acquisition. Offerors are required to complete and include a copy of the following provision with their proposals: FAR 52.212-3 -- Offeror Representations and Certifications -- Commercial Items. Certification and Representations shall be submitted via ORCA website https://orca.bpn.gov, FAR 52.212-4 -- Contract Terms and Conditions -- Commercial Items, applies to this acquisition as well as FAR 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--Commercial Items (Apr 2006) (Deviation), FAR 52.219-6 -- Notice of Total Small Business Set-Aside, FAR 52.222-3 -- Convict Labor , FAR 52.222-19 -- Convict Labor, FAR 52.232-33 Payment by Electronics Funds Transfer-Central Contractor Registration, FAR 52.233-3 -- Protest After Award, FAR 52.233-4 -- Applicable Law for Breach of Contract Claim , FAR 52.243-1 -- Changes -- Fixed-Price, FAR 52.247-34 -- F.o.b. Destination, FAR 52.249-1 -- Termination for Convenience of the Government (Fixed-Price) (Short Form) , FAR 52.252-6 -- Authorized Deviations in Clauses, DFARS 252.212-7001 (DEV) Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items, DFARS 252.225-7001 Buy American Act and Balance of Payments Program and DFARS 252.243-7001-- Pricing of Contract Modifications. See Numbered Note 1. Quotations are due 21 Aug 2006, by 2:00 pm. DST. E-mail: phillips_r@nsweast.socom.mil or fax quotations 757-492-1343 only. JOB SPECIFICATION 11mRB 39 Boat Repairs - Preservation Description Remove the following metal components from boat for preservation: Bow post, Hold #1 hatch and frame, Hold #2 hatch and frame, Console hatch and frame Console handrails (3 ea), Radar arch & its components, bolster hand rails, engine box vents, Engine box handrail & bases, jet compartment hatches, forward and aft gun mounts & flower pots, Swim platform strut, console terminal board plate, drive shafts & gearbox flanges, Racor filters, Priming pumps, Hydraulic deck connection protectors (8 ea), Console DICP beraker bezels Throttle/Waterjet/Gearbox bezels, Battery tray Replace the ground plane on the radar arch Blast all removed components to white metal Apply CeRam Kote to all components Power tool clean and prep jet compartment hatch rings and CeRam Kote them in place Paint swim plat backing plate Provide and install new gasket material in all hatches Reinstall all components using new hardware and pins Boat Repairs - Hull & Topside Description Repair hull scratches, gouges and nicks caused by trailering Repair nicks in forward deck area (approximately 10 ea) Accomplish fiberglass repairs port and starboard exhaust deflectors to eliminate cracks and chips Accomplish fiberglass repairs to bow Repair all lift strake damage on both sides and swim platform damage Grind clearance on engine boxes around latches to eliminate gouging Prepare entire topside and console for all over Armorcote Armorcoat all repaired areas Armorcoat Hold #1 compartment completely Armorcoat Hold #2 compartment completely Paint 3rd & 4th bolsters Armorcoat forward bolster frames and the 5 each bolster shells Accomplish an all over buff of the boat Boat Repairs - Mechanical Description Perform electrical OP test of all circuits to determine any needed repairs & report to unit Provide and install a new horn Provide and install a new acrylic windshield Remove the steering nozzle, end bell and guide vane chamber from both jets Check all components and adjust impeller clearances Report to unit any materials needing replacement Cut out loose caulk and recaulk both water jets Prep and preserve the exterior and interior of both water jets with Interprotect 2000 & Trilux 33 Assemble jets Replace blower hoses w/ new orange hose & alum vents Reattach insulation for the engine compartment hatch cover Work/replace back flush cables (GFE) Install zinc mod on jets Provide and install port & starboard console bags Provide and install GPS and Radar cover & track Provide and install console splash shield Provide and install new foam and covers for all handrails Replace rubber edging on seat bolsters (5 each) Replace bolster seat locking pin strap covers (10 total) on 1st & 2nd row bolsters Provide and install new 4th row slick bolster cushion Provide new anchor chain bag Remove existing and reinstall all treadmaster and ensulite on entire deck Fwd hold #1 foot pmp bags (2 each) Radar arch Covers Replace ratchet straps in fwd hold # 2 Replace hyd. Bag in fwd hold # 2 Provide 40 man-hours and $750.00 materials for growth repairs and for incidental items not covered by specifications Solicitation is modified to read as follows: Correct number of crafts to read four (4) crafts and one (1) trailer. Crafts will be available for viewing on the following dates: Friday, Aug 11 0930-1130; Tuesday, Aug 15 0930-1400 and Thursday, Aug 17, 0930-1400. Serial production is expected; crafts will be worked in accordance with SBT-20's priority 11mRB 40 Trailer Repairs Description Provide and install a new winch, cable and hook Boat Repairs - Preservation Description Remove the following metal components from boat for preservation: Bow post, Hold #1 hatch and frame, Hold #2 hatch and frame, Console hatch and frame Console handrails (3 ea), Radar arch & its components, bolster hand rails, engine box vents, Engine box handrail & bases, jet compartment hatches, forward and aft gun mounts & flower pots, Swim platform strut, console terminal board plate, drive shafts & gearbox flanges, Racor filters, Priming pumps, Hydraulic deck connection protectors (8 ea), Console DICP beraker bezels Throttle/Waterjet/Gearbox bezels, Battery tray Blast all removed components to white metal Apply CeRam Kote to all components Power tool clean and prep jet compartment hatch rings and CeRam Kote them in place Prepare and paint the sail track on the forward deck Paint swim plat backing plate Provide and install new gasket material in all hatches Reinstall all components using new hardware and pins Boat Repairs - Hull & Topside Description Repair hull scratches, gouges and nicks caused by trailering Repair nicks in forward deck area (approximately 10 ea) Accomplish fiberglass repairs port and starboard exhaust deflectors to eliminate cracks and chips Accomplish fiberglass repairs to bow Accomplish fiberglass repairs to frame to stringer bonding angle in engine compartment Repair all lift strake damage on both sides and swim platform damage Grind clearance on engine boxes around latches to eliminate gouging Prepare entire topside and console for all over Armorcote Armorcoat all repaired areas Armorcoat Hold #1 compartment completely Armorcoat Hold #2 compartment completely Paint 3rd & 4th bolsters Armorcoat forward bolster frames and the 5 each bolster shells Accomplish an all over buff of the boat Boat Repairs - Mechanical Description Perform electrical OP test of all circuits to determine any needed repairs & report to unit Provide and install a new horn Provide and install a new acrylic windshield Provide and install new shocks for windshield Remove the steering nozzle, end bell and guide vane chamber from both jets Check all components and adjust impeller clearances Report to unit any materials needing replacement Cut out loose caulk and recaulk both water jets Prep and preserve the exterior and interior of both water jets with Interprotect 2000 & Trilux 33 Assemble jets Replace blower hoses w/ new orange hose & alum vents Reattach insulation for the engine compartment hatch cover Work/replace back flush cables Install zinc mod on jets Provide and install port & starboard console bags Provide and install GPS and Radar cover & track Provide and install new foam and covers for all handrails Replace rubber edging on seat bolsters (5 each) Replace bolster seat locking pin strap covers (10 total) on 1st & 2nd row bolsters Provide and install new 4th row slick bolster cushion Provide new anchor chain bag Remove existing and reinstall all treadmaster and ensulite on entire deck Fwd hold #1 foot pmp bags (2 each) Radar arch Covers Replace ratchet straps in fwd hold # 2 Replace hyd. Bag in fwd hold # 2 Provide 40 man-hours and $750.00 materials for growth repairs and for incidental items not covered by specifications 11mRB 111 Description Accomplish starboard aft hull repairs Armorcoat to match Replace 20 feet of bunk boards Provide and install all new foam and sailcloth Seal around jet intake flanges Replace petcock in marine gear w/ GFE part 11mRB 112 Description Repair fiberglass on bow under port sponson (R/R sponson & bra) Repair fiberglass keel damage Armorcoat to match Repair trailer harness Replace 20 feet of bunk boards Provide and install all new foam and sailcloth Repairs consist of 3 Boats and 1 Trailer Period of Performance 28 Aug through 31 Oct 2006 NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (10-AUG-2006). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 05-OCT-2006, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/ODA/USSOCOM/SanDiegoCA/H92242-06-T-0017/listing.html)
 
Place of Performance
Address: SPECIAL BOAT TEAM 20 NAB LITTLE CREEK NORFOLK VA
Zip Code: 23521
Country: UNITED STATES
 
Record
SN01162471-F 20061007/061005223059 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.