Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 19, 2006 FBO #1635
SOLICITATION NOTICE

Y -- Saxon Creek Tributary Trail Bridge

Notice Date
5/17/2006
 
Notice Type
Solicitation Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-5 IBET Province, Tahoe N.F., 631 Coyote Street, Nevada City, CA, 95959-2250
 
ZIP Code
95959-2250
 
Solicitation Number
AG-9A63-S-06-0069
 
Response Due
7/14/2006
 
Archive Date
7/29/2006
 
Description
Saxon Creek Tributary Trail Bridge project consists of new bicycle/equestrian trail bridge construction. The bridge is 20 feet long by 6 feet wide between rails and composed of Douglas-fir pressure treated following Best Management Practice for an aquatic environment. The project also includes trail redesignation, deconstruction and disposal of existing water crossing, and obliteration of existing trail. Saxon Creek Tributary Trail Bridge project is located in El Dorado County, CA on the Saxon Creek Trail also known to mountain bikers as Mr. Toad?s Wild Ride. There are two trail access points to the project location. From South Lake Tahoe, head south on Interstate Highway 50/California Highway 89 to Meyers. Turn east onto Apache Avenue-a residential road. Follow Apache around, turn east onto Mohican Drive. Mohican Drive runs into Iroquois Circle. Head south on Iroquois Circle ending in the southeast corner to Forest Service access road 18E13. The Saxon Creek Tributary crossing is approximately 0.75 mile southeast from the end of the Forest Service access road on trail 18E13. The second trail access point is reached by traveling southwest on Pioneer Trail from South Lake Tahoe. Pioneer Trail is accessed from Highway 50 heading west about 0.5 miles from Stateline, NV. Travel Pioneer Trail approximately 6.75 miles. Turn east onto Oneidas Street. Turn South onto 12N01A. The trailhead is approximately 1 mile south on 12N01A. From the trailhead, the project location is approximately 1.5 miles south. The project is located within Section 33, Township 11N, Range 18E. Estimated solicitation issue date 06/15/2006. Estimated start work date 09/15/2006, contract time 35 days. Government price range $25,000 to $100,000.
 
Place of Performance
Address: Lake Tahoe Basin Management Unit, South Lake Tahoe, Ca
Zip Code: 96150-4500
Country: USA
 
Record
SN01049689-W 20060519/060517220239 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.