Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 04, 2006 FBO #1531
MODIFICATION

Z -- Hydraulic Power Unit Skid

Notice Date
2/2/2006
 
Notice Type
Modification
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
100 Kindel Drive Suite A332 Arnold AFB, TN
 
ZIP Code
00000
 
Solicitation Number
FA9101-06-R-0021
 
Response Due
3/15/2006
 
Archive Date
4/4/2006
 
Point of Contact
Sue Tate, 9314547801
 
E-Mail Address
Email your questions to sue.tate@arnold.af.mil;rick.stewart@arnold.af.mil
(sue.tate@arnold.af.mil;rick.stewart@arnold.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This project consists of providing all parts, labor, equipment, tools, and material to design, fabricate, and install a new Hydraulic Power System (HPS). The HPS shall contain a hydraulic power skid, heat exchanger skid, and accumulator banks. This project includes, but is not limited to a new hydraulic power skid that provides 300 gpm and is capable of producing a pressure of 2000 psig. The operating pressure for the unit shall be set to the range of 1400-1600 psig. The pumps on the hydraulic skid shall be double vane balanced pumps. The skid shall contain 4 motors and 4 pumps. During operation, only three pumps shall be used to produce the 300 gpm flow requirement with the fourth pump meeting the requirements of availability, reliability, and maintainability. The operating temperature of the fluid is 120 (+/- 5??F) degrees Fahrenheit. The fluid for the hydraulic system shall be filtered in the supply line and the recirculation loop. The hydraulic skid shall have a containment area that will hold 110 % of the fluid in the reservoir. The heat exchanger skid shall be separate from the hydraulic power skid. The accumulator skids shall contain 23 10-gallon accumulators. Installation of the HPS includes connecting piping (supply and return) to existing actuators. The motor control center, wiring, and all additional components shall be provided and installed by the contractor. This project includes construction of a shelter for the HPS and removal and cleanup of an existing system. The period of performance will be 200 calendar days following notice to proceed. This RFP will be available (electronically only) on or about February 14, 2006. For more information on "Hydraulic Power Unit Skid", please refer to: http://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=4267
 
Web Link
Hydraulic Power Unit Skid
(http://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=4267)
 
Place of Performance
Address: Arnold Air Force Base Arnold Air Force Base TN
Zip Code: 37389
Country: United States
 
Record
SN00978949-W 20060204/060202212117 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.