Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 30, 2005 FBO #1342
MODIFICATION

71 -- Maintenance Training Facility Furniture

Notice Date
6/1/2005
 
Notice Type
Modification
 
NAICS
337214 — Office Furniture (except Wood) Manufacturing
 
Contracting Office
Department of the Air Force, Air Mobility Command, 43rd CONS, 1443 Reilly Rd Suite C, Pope AFB, NC, 28308-2896
 
ZIP Code
28308-2896
 
Solicitation Number
F3M2MG5123A1
 
Response Due
6/8/2005
 
Point of Contact
Justin Wong, Contract Specialist, Phone 910-394-6258, Fax 910-394-5687,
 
E-Mail Address
justin.wong@pope.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
Below are questions posed by potential offerors and answers from the Contracting Squadron. Proposals are due 8 June 2005 at 1600EST. Q: Will the elevator be available for use in moving? A: Yes Q: When will the walls be finished? A: Approximately 8 June 2005 Q: Is there a loading dock? A: Yes Q: What is the width of the interior door jams? A: 34.5 inches Q: Are the lecterns pictured in the drawings a part of this bid package? A: No they will be a part of a future package Q: What is the building completion date? A: 15 August 2005 Q: What type of Internet connection will be offered? A LAN they will not be wireless Q: Is the PDF File to scale? A: The PDF File is NOT to scale. The AUTOCAD model space is to scale. Q: How can bid be submitted? A: By Mail, Fax, E-mail Q: How is the electrical system to be set up? A: It will be hard-wired from the wall. Q: Can the drawings be saved to an ACAD2000? A: Yes they can be saved to Acad2000. Q: What is the size of the LCD monitors? A; 17” LCD’s. Q. Are power clusters required on the 42x30 desks also, or only on the 72x30 desks? A: Yes they are required for both desks. Q. The additional power spec is unclear, it says that the power cord must be long enough so that the strip can go into the farthest desk from the wall. On a four desk cluster that will be 168" from the wall (is that correct for cord length)? A: Can’t give a specific dimension. That would depend on the vendors desk sizes, but the idea is to leave enough slack that the cords can reach furthest desk from the wall. Q. On the three desk clusters how many power strips will be required? The spec only mentions each group of 4 A: Two power strips for each three desks. Q: Can more specifics be given on the chair requirement? A: The principal characteristic that we are looking for in the chairs is that they function with the desk that are in each offerors' proposal. They need to meet the guidelines in the statement of work. NOTE: THIS NOTICE MAY HAVE POSTED ON WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (01-JUN-2005). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 28-JUL-2005, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USAF/AMC/43CONS/F3M2MG5123A1/listing.html)
 
Place of Performance
Address: Pope AFB, NC
Zip Code: 28308
Country: USA
 
Record
SN00857562-F 20050730/050728213844 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.