Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 15, 2005 FBO #1327
MODIFICATION

99 -- FIBER OPTIC CABLING

Notice Date
7/13/2005
 
Notice Type
Modification
 
Contracting Office
N0464A 2008 Stumpneck Rd Indian Head, MD
 
ZIP Code
00000
 
Solicitation Number
N0464A05Q0031
 
Response Due
7/25/2005
 
Archive Date
7/25/2005
 
Point of Contact
PENNY SWANN 301 744-6884 TECHNICAL POC: KANDY WILMOTH, 301 744-6920 X 237, SOLICITATION POC: PENNY SWANN, 301 744-6884
 
E-Mail Address
Email your questions to SWANN@EODPOE2.NAVSEA.NAVY.MIL
(SWANN@EODPOE2.NAVSEA.NAVY.MIL)
 
Description
THIS SOLICITATION HAS BEEN MODIFIED TO CHANGE THE FOLLOWING ITEMS: - THE RESPONSE DATE HAS BEEN CHANGED FROM 18 JULY 05 TO 25 JULY 05 - UNDER FIRST FLOOR SECTION, ITEM ONE READS: FIRST FLOOR: 1. CONTRACTOR SHALL PROVIDE AND INSTALL (15) RED 4 STRAND 62.5/125 MULTI-MODE, PLENUM FIBER OPTIC CABLES FROM THE CUSTOMER PROVIDED CABINET LOCATED WITHIN FURNITURE CUBICLE 84 AS SHOW ON THE CUSTOMER PROVIDED FLOOR PLANS. ITEM ONE SHOULD READ: FIRST FLOOR: 1. CONTRACTOR SHALL PROVIDE AND INSTALL (16) RED 4 STRAND 62.5/125 MULTI-MODE, PLENUM FIBER OPTIC CABLES FROM THE CUSTOMER PROVIDED CABINET LOCATED WITHIN FURNITURE CUBICLE 84 AS SHOW ON THE CUSTOMER PROVIDED FLOOR PLANS. - UNDER TESTING, LABELING & ADMIN SECTION ITEM SEVEN READS: 7. CONTRACTOR SHALL PROVIDE AND INSTALL ONE PIPE RUN OF 3/4" EMT FROM ROOM #262 TO ROOM #139 AND SET A CEILING TERMINATION POINT. ITEM SEVEN SHOULD READ: 7. CONTRACTOR SHALL PROVIDE AND INSTALL ONE PIPE RUN OF 3/4" EMT FROM ROOM #261 TO ROOM #262 AND RELOCATE FIBER. FULLY CORRECTED SOLICITATION BELOW. STATEMENT OF WORK FOR HORIZONTAL FIBER OPTIC CABLING TO BUILDING 2172 CONTRACTOR WILL PROVIDE ALL MATERIALS FOR THE COMPLETION OF THE FOLLOWING STATEMENT OF WORK. THE FOLLOWING IS A REQUIREMENT FOR HORIZONTAL FIBER OPTIC CABLING FOR BUILDING 2172: FIRST FLOOR: 1. CONTRACTOR SHALL PROVIDE AND INSTALL (16) RED 4 STRAND 62.5/125 MULTI-MODE, PLENUM FIBER OPTIC CABLES FROM THE CUSTOMER PROVIDED CABINET LOCATED WITHIN FURNITURE CUBICLE 84 AS SHOW ON THE CUSTOMER PROVIDED FLOOR PLANS. 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY CEILING MOUNTED OUTLET LOCATIONS. 3. CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY 8 PORT DOUBLE GANG FACEPLATES FOR ALL STATION LOCATIONS. 4. CONTRACTOR SHALL TERMINATE ALL STATION AND CLOSET TERMINATIONS WITH ST CONNECTORS ON BOTH ENDS. 5. CONTRACTOR SHALL PROVIDE AND INSTALL (1) RACK MOUNTED 72 PORT FIBER OPTIC ENCLOSURE WITH ST CONNECTOR SIX PACKS TO HOUSE ALL NEWLY INSTALLED RED 4 STRAND MULTI-MODE FIBER OPTIC CABLE. THIS ENCLOSURE WILL BE INSTALLED WITHIN THE CUSTOMER PROVIDED CABINET. 6. RELOCATE EXISTING 12 STRAND MULTI-MODE FIBER OPTIC CABLE. SECOND FLOOR: 1. CONTRACTOR SHALL PROVIDE AND INSTALL (56) RED 4 STRAND 62.5/125 MULTI-MODE, PLENUM FIBER OPTIC CABLES FROM THE CUSTOMER PROVIDED CABINET LOCATED IN ROOM 262, BLOCK 49 AS INDICATED ON FLOOR PLAN. 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY CEILING MOUNTED OUTLET LOCATIONS. 3. CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY 8 PORT DOUBLE FACEPLATES FOR ALL STATION LOCATIONS. 4. CONTRACTOR SHALL TERMINATE ALL STATION AND CLOSET TERMINATIONS WITH ST CONNECTORS ON BOTH ENDS. 5. CONTRACTOR SHALL PROVIDE AND INSTALL (3) RACK MOUNTED 72 PORT FIBER OPTIC ENCLOSURE WITH ST CONNECTOR SIX PACKS TO HOUSE ALL NEWLY INSTALLED RED 4 STRAND MULTI-MODE FIBER OPTIC CABLES. THIS CABINET WILL BE INSTALLED WITHIN THE CUSTOMER PROVIDED CABINET. TESTING, LABELING & ADMIN: 1. CONTRACTOR SHALL TEST FIBER STRANDS USING A CORNING POWER METER AND LIGHT SOURCE. ACCEPTANCE CRITERIA WILL BE BASED ON ATTENUATION BUDGET SET BY ANSI/TIA/EIA STANDARDS. 2. CONTRACTOR SHALL DELIVER SOFT COPY OF TEST RESULTS IN MS WORD FORMAT TO THE CUSTOMER FOLLOWING COMPLETION OF THE PROJECT. 3. CONTRACTOR SHALL LABEL PATCH PANELS, TERMINATION HARDWARE, CABLES, FACEPLATES AND JACKS ACCORDING TO CUSTOMER STANDARDS. 4. CONTRACTOR SHALL GENERATE A SOFT AND HARD COPY AUTOCAD FLOOR PLAN DRAWINGS TO DEPICT OUTLET LOCATIONS, OUTLET ID'S, ROUTES AND LABELS OF NEWLY INSTALLED WORK. CONDUIT WORK FROM THE CLOSET TO EACH STATION LOCATION: CONTRACTOR WILL PERFORM THE NECESSARY ELECTRICAL WORK FOR THE FOLLOWING SCOPE OF WORK: 1. CONTRACTOR SHALL FURNISH AND INSTALL (3) MAIN JUNCTION BOXES FOR PULL BOXES FOR COMMUNICATION CABLE. 2. CONTRACTOR SHALL FURNISH AND INSTALL 2" EMT FROM NETWORK ROOM TO (3) MAIN JUNCTION BOXES. 3. CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" EMT FROM THREE MAIN JUNCTION BOXES TO EACH CEILING TERMINATION POINT. 4. CONTRACTOR SHALL PROVIDE AND INSTALL A TOTAL OF (31) CEILING TERMINATION POINT JUNCTION BOXES IN MAIN WORK AREA. 5. CONTRACTOR SHALL PROVIDE AND INSTALL A TOTAL OF (5) WALL MOUNTED TERMINATION POINTS IN ROOM #262. 6. CONTRACTOR SHALL PROVIDE AND INSTALL (2) TERMINATION POINTS PER POWER POLE IN ROOM #262. 7. CONTRACTOR SHALL PROVIDE AND INSTALL ONE PIPE RUN OF 3/4" EMT FROM ROOM #261 TO ROOM #262 AND RELOCATE FIBER. 8. CONTRACTOR SHALL PROVIDE THAT ALL PIPE RUNS WILL HAVE A PULL STRING FOR COMMUNICATION CABLE. - OUTLET LOCATIONS AND ROUTES WILL BE DETERMINED BY NAVEODTECHDIV PERSONNEL AND CLEARLY MARKED ON FLOOR PLANS. FLOOR PLANS WILL BE DELIVERED TO CONTRACTOR PRIOR TO START OF INSTALLATION. - CONTRACTOR WILL INSTALL THE OUTLET WITHIN FOUR FEET OF THE SPECIFIED LOCATION. - CONTRACTOR WILL INFORM, IN ADVANCE, NAVEODTECHDIV OF ANY FURNITURE AND LARGE ITEMS THAT NEED TO BE MOVED. - CONTRACTOR WILL PROVIDE INFORMATION AND PRICING IF REQUESTED. - CONTRACTOR WILL PROVIDE A ONE (1) YEAR WARRANTY/GUARANTEE ON THE INSTALLATION AND PERFORMANCE OF ALL CABLES, CONNECTORS AND HARDWARE. - TECHNICAL POINT OF CONTACT: KANDY WILMOTH, 301-744-6920 EXT. 237. AFTER CONTRACT AWARD, CONTRACTOR MUST NOTIFY KANDY WILMOTH FOR SCHEDULING DATES AND TIMES. NAVEODTECHDIV WILL PROVIDE AN ESCORT WHILE ALL CONTRACTING WORK IS BEING PERFORMED. FREE AND READY ACCESS WILL BE PROVIDED TO ALL REQUIRED AREAS. ALL WORK WILL BE PERFORMED/COMPLETED ON AFTER HOURS MONDAY-FRIDAY 5:00PM-1:00AM. DELIVERABLES: - CROSS-CONNECTS AND PATCH CABLES WILL BE PROVIDED BY CONTRACTORS FOR ALL WORKSTATIONS AND SWITCHES. - AUTOCAD FLOOR PLANS WILL BE PROVIDED BY CONTRACTOR IN A HARD AND SOFT COPY FORMAT. GOVERNMENT FURNISHED PROPERTY: - GFP ONE (1) EQUIPMENT CABINET ON SECOND FLOOR IN ROOM # 262 - GFP ONE (1) EQUIPMENT CABINET ON FIRST FLOOR IN CUBICAL 84 NOTE: ALL COMPANIES BIDDING ON WORK MUST DO AN ON SITE SURVEY. THE ON SITE SURVEY WILL BE BY APPOINTMENT ONLY, MONDAY - THURSDAY, 0730 - 1400. SURVEY WILL BE COORDINATE THROUGH NAVEODTECHDIV CONTRACTING OFFICER: PRISCILLA SWANN, 301-744-6884. SURVEYS MUST BE COMPLETED BY JULY 18, 2005.
 
Record
SN00846547-W 20050715/050713212604 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.