Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 15, 2005 FBO #1297
SOLICITATION NOTICE

38 -- Ruby Gulch Toe Completion

Notice Date
6/13/2005
 
Notice Type
Solicitation Notice
 
Contracting Office
BUREAU OF RECLAMATION PO BOX 25007, D-7810 DENVER CO 80225
 
ZIP Code
80225
 
Solicitation Number
05SP811127
 
Archive Date
6/13/2006
 
Small Business Set-Aside
Total Small Business
 
Description
Description: The Bureau of Reclamation has a requirement to construct and complete Gilt Edge Mine Superfund Site, Phase 4, Ruby Gulch Waste Rock Repository and Cap, Operable Unit 3. The objective of Phase 4 work is to complete the geomembrane cap system at the toe of Ruby Gulch. The work includes: excavation and removal of the existing Ruby Pond impoundment at the toe of the Repository. This impoundment is a geomembrane-lined pond which captures and provides temporary storage of acid rock drainage (ARD) which discharges from the Ruby Repository. The pond geomembrane is approximately 10 years old and leaks. Acid water leaking from the pond is captured and pumped back into the pond by a leak detection pump and by a downstream seepage cut-off wall and pumping system. A new subsurface ARD storage vault and a new pond will be constructed. The ARD vault is composed of a network of HDPE pipe and will require modification of the existing pump house. Primary components of work include:: water for dust abatement, clearing and grubbing, stripping topsoil, removing water, earthwork, geotextile, geomembrane cover system, textured geomembrane pond liner, riprap, polyethylene pipe culverts, polyethylene drain pipe, relocating and reinstalling pump house, automating pump operations, and Power lines in conduit. Since this is a Superfund site, prospective bidders are cautioned that the work requires compliance with CERCLA regulations. The estimated price range for this construction work is $1,000,000 to $5,000,000. This acquisition is being offered for competition as a total small business set-aside, using Sealed Bidding Procedures. A formal site visit which will include a question and answer period will be conducted on/or about July 12, 2005 in Deadwood, SD. The specific date and time will be published in the solicitation.
 
Web Link
Please click here to view more details.
(http://ideasec.nbc.gov/j2ee/announcementdetail.jsp?serverId=BR142581&objId=96217)
 
Place of Performance
Address: Gilt Edge Mine Superfund Site, Deadwood, SD
Zip Code: 57732
Country: US
 
Record
SN00828816-W 20050615/050613211913 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.