Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 22, 2005 FBO #1273
MODIFICATION

95 -- HMMWV assault vehicle modifications

Notice Date
5/20/2005
 
Notice Type
Modification
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
Other Defense Agencies, U.S. Special Operations Command, USASOC, ATTN:E-2929, Fort Bragg, NC, 28310
 
ZIP Code
28310
 
Solicitation Number
H92239-05-T-0028
 
Response Due
6/2/2005
 
Archive Date
6/17/2005
 
Point of Contact
Carl Oelschig, Contract Specialist, Phone 910-432-7857, Fax 910-432-9345,
 
E-Mail Address
oelschic@soc.mil
 
Small Business Set-Aside
Total Small Business
 
Description
H92239-05-T-0028– HMMWV Modifications for Assault Vehicle CHANGE 1: There has been a change in quantity of vehicles. There is an increase of one vehicle from four vehicles to five vehicles. Questions from Contractors: Q1. Do you have drawings or do you need them written as the modifications are made? A1. We do not have any drawings at the time. It will be up to the contractor to submit their technical drawings with their proposal. At the site visit, the contractor will have a chance to view a vehicle and the specific modifications to be done to it. Anamendment will be posted after the site visit to cover specific questions and clarify all modifications. Q2.Acess to your technical support? A2. There will be personnel from the unit who can be reached for questions, however, the contractor will leave the site visit with a clear undertanding of the modifictions. If there are further questions to be answered then the contractor can sned them to the contracting officer. Q3. Design criteria-Removability, spares, repairs, etc? A3. A few of the modifications will allow for removal. Clarification will be made at the site visit on 24 May at 10:00 a.m. We are not asking for spare parts. Repairs will be done at the unit's discretion. Q4. What type of pricing contract is this? A4. Firm-fixed price. Q5. When do you need these vehicles completed? A5. As stated in the combined synopsis/solicitation, the required date of completion of work is 20 Jun 05. However, earlier completion of this project is authorized and encouraged. NOTE: THIS NOTICE WAS NOT POSTED TO WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (20-MAY-2005); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/ODA/USSOCOM/FortBraggNC/H92239-05-T-0028/listing.html)
 
Place of Performance
Address: Ft. Bragg, NC
Zip Code: 28307
Country: USA
 
Record
SN00813338-F 20050522/050520220114 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.