Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 15, 2005 FBO #1236
SOURCES SOUGHT

10 -- MK19 Mod 3 40MM Grenade Machine Gun

Notice Date
4/13/2005
 
Notice Type
Sources Sought
 
Contracting Office
US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
 
ZIP Code
07806-5000
 
Solicitation Number
W15QKN-05-X-0442
 
Response Due
4/28/2005
 
Archive Date
5/28/2005
 
Point of Contact
Jennifer Aber, Contract Specialist, (973)724-4113
 
E-Mail Address
Jennifer Aber
(jaber@pica.army.mil)
 
Description
The US Army Armaments, Engineering and Technology Center Small and Medium Caliber Weapons System Division, Picatinny, NJ 07806-5000 is interested in procuring 965 MK19 Mod 3 40MM Grenade Machine Guns (GMG). The MK19 Mod 3 is a crew served man portable 40 MM grenade machine gun capable of full automatic fire delivering aimed fire to area targets up to 2012 meters and with a rate of fire of 325-400 rounds per minute (RPM). The MK19 Mod 3 can be mounted on the ground or on vehicle applications. The MK19 Mod 3 GMG is a sensitive Category II item as described under DOD 5100.76-M, Physical Security of Sensitive Conventional Arms, Ammunition and Explosives. Category II Transportation Protective Service (TPS) of Armed Guard Surveillance while in transit is required pursuant to AR 55-355, Defense Traffic Management Regulation. In accordance with current DOD Policy, all security sensitive items will be procured under "For Origin Only" delivery items. Interested parties must provide proof and demonstrate the ability to manufacture the MK19 Mod 3 40MM GMG in accordance with drawing 12997550 and meet the performance characteristics outlined in MIL-G-70790. Technical Data Package (TDP) is available upon request. The contractor is required to provide appropriate firing ranges to constrain the function firing of the MK19 Mod 3 in accordance with the proper adherence to Army and OSHA standards. All live fire will be accomplished by remote fire. Minimum production rate shall be 100 weapons per month after first article. The US Government requires first delivery of MK19 Mod 3's ten (10) months after contract award date. This is a market survey, not a pre-solicitation notice. There is no formal solicitation available at this time. If a formal solicitation is generated at a later date, a solicitation notice will be published. No award will be made from this market survey. All information is to be submitted at no cost or obligation to the Government. See Numbered Note 25. NOTE: THIS NOTICE WAS NOT POSTED TO WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (13-APR-2005); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
US ARMY TACOM-Picatinny Procurement Network
(http://www.eps.gov/spg/USA/USAMC/DAAE30/W15QKN-05-X-0442/listing.html)
 
Record
SN00787763-F 20050415/050413214028 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.