A -- Request for Information (RFI) on Ultra-Sensitive Detectors and Advanced Diagnostics

Notice Date
9/15/2004
 
Notice Type
Solicitation Notice
 
NAICS
541710 — Research and Development in the Physical, Engineering, and Life Sciences
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, ASC/TMK, 1350 Wyoming Blvd SE, Bldg 20200, Kirtland, NM, 87117
 
ZIP Code
87117
 
Solicitation Number
Reference-Number-BAA-AL-2005-01
 
Response Due
10/1/2004
 
Point of Contact
Dax Presuto, Contract Manager, Phone 505-846-0758, Fax 505-846-2931, - Janice Olson, Contracting Officer, Phone 505-853-4063, Fax 505-846-2931,
 
E-Mail Address
dax.presuto@kirtland.af.mil, janice.olson@kirtland.af.mil
 
Description
Request for Information Ultra-Sensitive Detectors and Advanced Diagnostics ___________ THIS DOCUMENT IS A REQUEST FOR INFORMATION (RFI) ONLY. THE GOVERNMENT DOES NOT INTEND TO AWARD A CONTRACT ON THE BASIS OF THIS RFI OR TO OTHERWISE PAY FOR THE INFORMATION RECEIVED EXCEPT AS AN ALLOWABLE COST UNDER OTHER CONTRACTS AS PROVIDED IN FAR 31.205-18, BID AND PROPOSAL COSTS. BASED ON THE RESULTS OF THIS RFI, THE GOVERNMENT DOES INTEND TO SUBMIT A BROAD AGENCY ANNOUNCEMENT, BAA AL-2005-01, REQUESTING PROPOSALS UNDER THE SAID TOPICS. ___________DO NOT PREPARE OR SUBMIT PROPOSALS IN RESPONSE TO THIS RFI. THE PURPOSE OF THE RFI IS TO RECEIVE INPUT FROM INDUSTRY ON THE FOLLOWING TECHNICAL REQUIREMENTS. TECHNICAL QUESTIONS AND SUGGESTIONS SHOULD BE ADDRESSED TO THE TECHNICAL POCs FOR EACH AREA LISTED BELOW. SPECIFIC QUESTIONS ARE LISTED AT THE END OF THE DOCUMENT. RESPONSES TO THIS RFI ARE DUE BY 1 OCTOBER 2004. SEND RESPONSES TO CAPT DAX PRESUTO, MDA/ALK, 1350 WYOMING BLVD SE, BLD 20200, KIRTLAND AFB, NM 87117-5536 OR DAX.PRESUTO@KIRTLAND.AF.MIL. ___________ CONTACTS Technical questions, comments, or suggestions regarding the Ultra-Sensitive Detectors project should be directed to Dr. Jim Riker, AFRL/DE, at 808-875-4500 or jim.riker@maui.afmc.af.mil. ___________ Technical questions, comments, or suggestions regarding the Advanced Diagnostics project should be directed to 1Lt Heather Pietrzyk, MDA/ALD, at 505-853-3779 or heather.pietrzyk@kirtland.af.mil. __________ Contracting questions or if you would like to request a Word document of this RFI should be directed to Capt. Dax Presuto, MDA/ALK, at 505-846-0758 or dax.presuto@kirtland.af.mil. ___________ RFI TECHNICAL INFORMATION:Ultra-Sensitive Detectors___________ A. PROGRAM DESCRIPTION A. INTRODUCTION __________ The Department Of Defense (DOD) is interested in receiving proposals for very high frame rate, high bandwidth, low noise detection systems for applications in laser ranging and detection. The delivered system will consist of a detector, associated electronics needed to amplify and digitize the detector signal, cooling hardware, and documentation. The program will consist of three possibly overlapping phases for a total of 36 months: ____________ Phase 1 will span 12 months, and contractors are encouraged to demonstrate key elements of their technical approach such as system gain or read out noise that contributes to their system’s high sensitivity. This elemental performance should be combined with detailed modeling to illustrate the contractor’s technical approach will meet the program’s detection goals. We would expect that a phase-ending CDR would produce a camera design that the contractor expects could meet the specification goals. ____________ Phase 2 will cover fabrication of the detector and multiplexer units into a hybridized detection system in 18 months. ____________ Phase 3 will cover final design documentation, integration, testing and delivery within a 6-month period to a Government facility of the complete detection system that meets all technical performance listed herein. ___________ The Government anticipates awarding at most two contracts for this effort during phase 1, with a down select for phase 2 and 3. The anticipated magnitude of effort for this project is approximately $2.5M per year over 3 years but this amount is neither guaranteed nor is the Government obligated to meet this budget in the future. The projected start date is anticipated to be during the second quarter FY05 but is dependent upon availability of funding and the results of the contracting process. Open communication with the technical point of contact (POC), Dr. Jim Riker, at 808-874-1619, is encouraged until proposals are received. Contracting questions should be directed to Capt Dax Presuto at 505-846-0758 or dax.presuto@kirtland.af.mil. ___________ B. TECHNICAL TOPIC AREA: NOTE: THIS NOTICE MAY HAVE POSTED ON WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (15-SEP-2004). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 04-FEB-2005, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USAF/AFMC/041302/Reference-Number-BAA-AL-2005-01/listing.html)
 
Place of Performance
Address: ASC/TMK 1350 Wyoming Blvd SE Bld 20200 Kirtland AFB, NM
Zip Code: 87117-5536
Country: USA
 
Record
SN00746328-F 20050206/050204213801 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.