Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 01, 2005 FBO #1132
SOLICITATION NOTICE

A -- Topical BAA (#050997) for ?Sonar Solutions for High-Resolution Bottom Mine Detection and Classification for Unmanned Undersea Vehicle (UUV) Applications? (Part 2 of 2)

Notice Date
12/30/2004
 
Notice Type
Solicitation Notice
 
NAICS
541710 — Research and Development in the Physical, Engineering, and Life Sciences
 
Contracting Office
Department of the Navy, Naval Sea Systems Command, NUWC Division Newport, Simonpietri Drive, Newport, RI, 02841-1708
 
ZIP Code
02841-1708
 
Solicitation Number
050997(B)
 
Response Due
2/14/2005
 
Archive Date
3/1/2005
 
Description
E. OFFEROR?S STATEMENT OF WORK. 1. It is the intent of the Government to attach the offeror?s SOW, as written, into the resulting award document. This will occur only if the offeror?s SOW accurately describes the work to be performed, is enforceable, and is void of inconsistencies. 2. The following is offered as a recommended format for the SOW. Please limit your SOW to 5 pages. Begin this section on a new page. Start your SOW at Paragraph 1.0. 1.0 Objective: This section is intended to give a brief overview of the technology effort and should describe why it is being pursued, what you are trying to accomplish, and what aspect of this BAA is being addressed. 2.0 Scope: This section should include the technology area(s) to be investigated, objectives/goals, and major milestones for the effort. 3.0 Background: This section includes any information, explanations, or constraints that are necessary in order to understand the requirements. It may include relationships to previous, current and future operations. It may also include techniques previously tried and found ineffective. The offeror shall identify appropriate specifications, standards, and other documents that are applicable to the effort to be performed. 4.0 Tasks/Technical Requirements: 4.1 The detailed description of tasks which represent the work to be performed, are contractually binding. Thus, this portion of the SOW should be developed in an orderly progression and in enough detail to establish the feasibility of accomplishing the overall program goals. The work effort should be segregated into major tasks and identified in separately numbered paragraphs according to the decimal system as described herein. Each numbered major task should delineate, by subtask, the work to be performed, deliverables and CDRL items. The SOW must contain every task to be accomplished. The tasks must be definite, realistic, and clearly stated. Use ?shall? whenever the work statement expresses a provision that is binding. Use ?should? or ?may? whenever it is necessary to express a declaration of purpose. Use ?will? in cases where no offeror requirement is involved; e.g., power will be supplied by the Government. Use active voice in describing work to be performed. 4.2 If presentations/meetings are identified in your schedule, include the following paragraph in your SOW: ?Conduct presentations/meetings at times and places specified in the award document.? 5.0 Exit Criteria and Deliverables: Propose criteria for establishing or indicating that a specific milestone or phase has been completed. List the deliverables that result from that milestone or phase. 6.0 Contract Data Requirements List (CDRL) Items: Submit required information per blocks on DD Form 1423. F. EVALUATION CRITERIA: Proposals will be evaluated by a scientific review. Per FAR 35.016(e), the primary basis for selecting proposals for acceptance shall be technical competence, importance to NUWCDIVNPT programs, and funding availability. Cost realism and reasonableness shall also be considered. Technical competence includes: a. relevance to a UUV (submarine compatible, 21 inch diameter) sonar hardware/software need and clear transition path for test and evaluation usage, b. Likelihood of the proposed tasking to meet the schedule objectives, c. Minimal proprietary features, d. Maximum use of Commercial Off-The-Shelf (COTS) and Non-Developmental equipment and software, e. Adequacy of resources, f. Past Performance. (End Part 2 of 2 - BAA 050997)
 
Record
SN00728249-W 20050101/041230211940 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.