MODIFICATION
R -- NEW A-10 WING ASSEMBLY PRODUCTION
- Notice Date
- 9/30/2004
- Notice Type
- Modification
- NAICS
- 488190
— Other Support Activities for Air Transportation
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Hill AFB OO-ALC, OO-ALC/PKXD 6038 Aspen Ave (Bldg 1289), Hill AFB, UT, 84056
- ZIP Code
- 84056
- Solicitation Number
- Reference-Number-FA8202-04-R-AAAF
- Response Due
- 9/30/2004
- Archive Date
- 12/31/2004
- Description
- The following information is hereby added: IMPORTANT PCO NOTICE NOTE: The PCO on this effort is now Michael J Wood. Point of contact information is: (801) 586-3428, email Michael.wood@hill.af.mil Wing Assembly Production RFI, Solicitation FA8202-04-R-AAAF is hereby extended. Final vendor RFI responses are expected by close of business 8 October 2004. The following are answers to questions that concern the RFI 1. Are we asking the contractors to include MAB in the manufacturing of the new wings? The optimal solution would likely include MAB for final installation. An example might be to have the wing center and outer sections arrive at Hill for the installation and FCF. Or, maybe some control surface installations could be made at Hill, etc. There is no detailed requirement at this point. 2. Do we want MAB to manufacture parts of the wing for the contractor? No, MAB is not set up to handle production work in the context of having production processes in place for new flight structure. 3. Do we want the contractor to ID requirements for ALC involvement, If necessary? The intent of the statement is to have them consider reasonable sharing of workload in order to expedite the wing replacement process with minimal availability impacts. The requirements mentioned refer to what the contractor sees as necessary for a working arrangement to be developed between them and Ogden Air Logistic Center. It is completely understood that some contractors could support the entire process but some aspects of the task may not be in their area of expertise nor in their best interest, or that of the Air Force. Elements that affect this are modifications or other maintenance work impacting the fleet that could be timed with a wing change. All future information on this acquisition will be posted on the link below. Please check this link often for updates. http://contracting.hill.af.mil/AirCraft/A10WingAssy/A10WingAssy.asp
- Record
- SN00687001-W 20041002/041001111214 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |