Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 09, 2004 FBO #0865
MODIFICATION

63 -- Install Closed Caption Surveillance System For Bldgs 633 and 635

Notice Date
4/7/2004
 
Notice Type
Modification
 
NAICS
238210 — Electrical Contractors
 
Contracting Office
Department of the Air Force, Air Mobility Command, 436th CONS, 639 Atlantic Street, Dover AFB,, DE, 19902-5639
 
ZIP Code
19902-5639
 
Solicitation Number
F73LRS40620100
 
Response Due
4/15/2004
 
Archive Date
4/30/2004
 
Point of Contact
Keith Newton, Contract Specialist, Phone 302-677-5218, Fax 302-677-2309, - Therese Patterson, Team Lead/Contracting Officer, Phone 302-677-5104, Fax 302-677-2309,
 
E-Mail Address
keith.newton@dover.af.mil, therese.patterson@dover.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment is necessary to clarify previous requirement according to question and answers asked by contractors at site visit and via email. POC: K.C. Newton (302)677-5218 Ref #: F73LRS40620100 Date: 07 April 2004 Questions and answers from site visit and by email on 07 April 2004 Question 1: Are rapid dome gold PTZ an interior or exterior camera mounts. Answer 1: Camera and mounts are exterior Question 2: What is the saw cut drive conduit? Answer 2: The installation of one of the cameras requires trenching through asphalt to lay conduit from the camera to the monitoring station. Contractor is responsible for installing conduit under asphalt and returning asphalt to original condition. Question 3: Please elaborate on camera operation? Answer 3: The camera must be controllable from the monitoring station and each camera must have the capability to rotate 360 degrees. Question 4: Does all wiring have to be in conduit? Answer 4: Yes, all wiring mus be in conduit both inside and outside. Question 5: How much recording time does the government require from this system? Answer 5: The government requires 19 days of record time. Question 6: Will the contractor get any help from government employees? Answer 6: No labor or equipment will be provided for this project. Question 7: Can a contractor just bid on equipment and not on the installation? Answer 7: No, the contractor is expected to provide everything in the solicitation. Comment 1: Contractors must break down quote into line items. First line item should be for equipment; Second line item should be for installation of equipment. The third line item should be all the costs related to the trenching and replacement of blacktop.
 
Place of Performance
Address: B-633, Dover AFB, DE
Zip Code: 19902-5639
Country: USA
 
Record
SN00561721-W 20040409/040407212252 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.