Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 13, 2004 FBO #0838
MODIFICATION

Y -- HUBZONE CONSIDERATION (see description below) Highway Construction - NM PRA BAND 10(1), Route 10, Bandalier National Monument, Sandoval County, NM

Notice Date
3/11/2004
 
Notice Type
Modification
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, Room 259 555 Zang Street, Lakewood, CO, 80228-1010
 
ZIP Code
80228-1010
 
Solicitation Number
NM-PRA-BAND-10-1-ROUTE10
 
Response Due
4/27/2004
 
Archive Date
9/30/2004
 
Point of Contact
Lori K Rivera, Acquisition Program Specialist, Phone (303)716-2015, Fax (303)969-5971, - Brenda McGehee, Acquisition Program Specialist, Phone (303) 716-2080, Fax (303)969-5971,
 
E-Mail Address
lorik.rivera@fhwa.dot.gov, bmcgehee@road2.cflhd.gov
 
Description
THIS IS A MODIFICATION TO THE INITIAL NOTICE POSTED TO FEDERAL BUSINESS OPPORTUNITIES (FBO) ON MARCH 1, 2004. BY ISSUE OF THIS MODIFICATION, THIS PROCUREMENT IS ADVERTISED AS A TOTAL HUBZONE SMALL BUSINESS SET-ASIDE. PRESOLICITATION NOTICES ARE BEING SENT TO FIRMS ON THIS AGENCY'S MAILING LIST CONCURRENTLY WITH THE PUBLICATION OF THIS SYNOPSIS. OFFERS ARE SOLICITED ONLY FROM HUBZONE SMALL BUSINESS CONCERNS. OFFERS RECEIVED FROM CONCERNS THAT ARE NOT HUBZONE SMALL BUSINESSES WILL BE REJECTED. THE DUE DATE HAS CHANGED AS A RESULT OF THIS MODIFICATION TO APRIL 27, 2004. ALL OTHER INFORMATION IN ORIGINAL POSTING REMAINS THE SAME. Tentative Advertisement Date: March 16, 2004 PROJECT DETAILS: This project consists of asphalt surfacing, road reconditioning, and an option to include overlay of parking area on 1.5 miles for the entrance road to Bandalier National Monument, NM PRA BAND 10(1) - Route 10, in Sandoval County, New Mexico. The estimated price range is between $0.00 and $3,000,000. Principal work items on the primary schedule include: lump sum surveying and staking; lump sum contractor testing; 18,400 m2 removal of asphalt pavement; roadway excavation and subex; 2,150 m3 unclassified borrow; 15,500 m2 road reconditioning; 2,900 metric tons roadway aggregate (meth. 2); 420 metric tons asphalt cement; 7,000 metric tons Superpave asphalt concrete pavement; 160 m Portland cement concrete curb; 2,242 m colored Portland cement concrete curb (various depth); wheelchair ramp; 74 m guardrail system; heavy equipment operators (various); along with associated seeding, mulching, signing, pavement markings, signal lighting and traffic control. The Department of Transportation (DOT) Office of Small and Disadvantaged Business Utilization (OSDBU), has programs to assist minority, women-owned and disadvantaged business enterprises to acquire short-term working capital and bonding assistance for transportation-related contracts. This is applicable to any eligible prime or subcontractor at any tier. The DOT Bonding Assistance Program enables firms to apply for bid, performance and payment bonds up to $1.0 million per contract. The DOT provides an 80% guaranty on the bond amount to a surety against losses. Loans are also available under the DOT Short Term Lending Program (STLP) at prime interest rates to provide accounts receivable financing. The maximum line of credit is $750,000 with interest at prime rate, as published daily in the Wall Street Journal, plus 1.75 percent. For further information and applicable forms concerning the Bonding Assistance Program and/or the STLP, please call (800) 532-1169.
 
Record
SN00542465-W 20040313/040311222331 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.