Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 18, 2003 FBO #0751
MODIFICATION

63 -- Cannie Explosive Search Team

Notice Date
12/16/2003
 
Notice Type
Modification
 
Contracting Office
John F. Kennedy Center for the Performing Arts, Facilities Management Division, Contracting Office, 2700 F. Street, N.W., Washington, DC, 20566
 
ZIP Code
20566
 
Solicitation Number
JFK04R0001
 
Response Due
1/2/2004
 
Archive Date
1/17/2004
 
Point of Contact
Tara Hobson, Procurement Buyer, Phone (202) 416-8981, Fax (202) 416-8975,
 
E-Mail Address
trhobson@kennedy-center.org
 
Description
1. Revision (in parenthesis) to Section C.12.2.1 ? The Contractor shall provide the COTR with a list of the CEST teams professional training prior to reporting to post. Records of ongoing training shall also be (available) to the COTR (for review and inspection upon request.) 2. Questions and Answers are provided and made a part of this solicitation: Ref. C-7 - These types of backgrounds are very expensive processes to request, from the standpoint of both time and money for all involved. We suggest and request that we be permitted to provide evidence of US government suitability determinations for staff like access or security clearance verification in lieu of this requirement. This would mean the requirement has already been met on a far greater level that could be provided by ?private? checks, and would eliminate redundant federal dollars being spent. Answer: Contractors must demonstrate how their background checks meet or exceed C.7.1.2. Discuss the process of conducting your background checks. Ref. C-8 - If my personnel have already worked the Center on numerous occasions, I am assuming that this would be unnecessary. Is that assumption safe? Answer: Contractor personnel must meet each of the requirements established in Section C.8. Contractor?s technical proposal must demonstrate that they have obtained prior knowledge, training, and or orientation to meet the requirements of C.12.1.1 and 2. Ref. C.10.7 - Is that to mean the Center will not provide parking for the team(s) unless the team pays for parking? Answer: Yes. Ref. C.12.1.1 & 2 - Same question as C-8 above. Answer: Yes, Contractor personnel must meet each of the requirements established in Section C.12. Contractor?s technical proposal must demonstrate that they have obtained prior knowledge, training, and or orientation to meet the requirements of C.12.1.1 and 2. Ref. C.12.2.1 - We perform a significant amount of in-service training. Notifying the Center upon completion of any of it represents a major administrative burden, let alone within a certain period of time. Typically, the office here may not even receive the completion form for a couple of weeks. I am going to request this be waived, but if ever questioned by the COTR, then the records as they are at the time of the request can be faxed at that time. Will this be acceptable? Answer: See revised C.12.2.1 Lastly, may I request an electronic copy of your SF-33 as it will save us having to retype all of the information. Answer: We are unable to provide with an electronic copy of the solicitation, due to a lack of capability at this time.
 
Place of Performance
Address: JOHN F. KENNEDY CENTER, 2700 F STREET NW, WASHINGTON, DC
Zip Code: 20566
 
Record
SN00490815-W 20031218/031216212720 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.