Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 26, 2003 FBO #0451
MODIFICATION

L -- Technical Representative Services To Perform Facilitation Services

Notice Date
2/24/2003
 
Notice Type
Modification
 
Contracting Office
US Army Corp of Engineers - Alaska - Military Works, CEPOA-CT, P. O. Box 6898, Elmendorf AFB, AK 99506-6898
 
ZIP Code
99506-6898
 
Solicitation Number
DACA85-03-T-0024
 
Response Due
2/28/2003
 
Archive Date
4/29/2003
 
Point of Contact
Carolyn Haynes, 907/753-2545
 
E-Mail Address
Email your questions to US Army Corp of Engineers - Alaska - Military Works
(carolyn.i.haynes@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
NA This action was originally published in Fedbizops 21 Feb 2003. The following will replace the previous Description of Work in its entirety. THIS IS A NOTICE OF THE GOVERNMENT?S INTENT TO AWARD TO ONE SOURCE. Under the authority of FAR 6.302, the governmen t intends to award a sole-source contract to Organizational Excellence International,14 Homestead Ridge Hattiesburg, MS 39401 for facilitation services for the Bassett Army Replacement Hospital. The U.S. Army Corps of Engineers, Alaska District intends to acquire all services necessary to perform facilitation services. Work includes, but is not limited to providing two facilitators for 17 Apr 2003 (and 2004 ? 2006), to facilitate a one-day partnering workshop. Hours expected to be: 17 Apr 03, 0800-1700hr s. The workshop will be conducted in Fairbanks, Alaska. This workshop is an annual partnering meeting to be held in April (or coordinated otherwise) of every year during the construction of the Bassett Hospital (2003, 2004, 2005 and 2006). The facilitat or is responsible for coordinating with the Bassett Resident Office on the date of the annual partnering meeting. PROCURE MEETING FACILITIES: The facilitator is responsible for providing the meeting facilities at a Hotel in Fairbanks large enough to provid e a Conference Room that will hold 80 people, a projector view screen, and podium. The Hotel will also need to be able to block out 40-50 sleeping rooms for out of town attendees (Government and Non-Government). The conference room will need to be arrang ed from 8 AM to 5 PM for one day only on the day of the annual partnering workshop, along with two smaller (holding up to 25 folks each) breakout rooms, from 1-5 PM, the same day. The 40-50 sleeping rooms will be occupied for 4 nights, with some variation depending on the individual's schedules. The dates for the reservation of rooms will be coordinated with the Bassett Resident Office. We will want the Hotel to provide both morning (10 AM) and afternoon (1430) coffee/pop snack service for 80 people. The Hotel will need to provide a Partner Lunch from 1200-1300 on the day of the annual partnering workshop also. Note that the number of sleeping rooms used in that facility affects the price for conference facilities. The facilities will be available at 070 0 on the day of the annual partnering workshop to allow time for set-up. The facilitator shall bear all costs associated with providing all materials required for the workshop (i.e. partnering notepads/folder, pencil, pens, tapes, and easels with self-sti ck writing pads for all workgroup tables) and ensure that they are available. The facilitator will also provide an LCD Projector compatible with a Standard laptop PC and projection screen. Additional electrical equipment, to include power strip, extensio n cord, etc?will be furnished by the facilitator, as well. PREPARE WORKSHOP AGENDA: The facilitator shall prepare an agenda based on all materials provided, and any teleconferences. The agenda shall be presented in MS Word, via electronic means, in draft form no later than 30 days prior to partnering session. Upon receipt of comments or requested changes either verbally or by electronic means (NLT 14 days prior to session), said changes will be incorporated and a final agenda shall be presented in MS Wo rd, via electronic means, no later than 7 days prior to session. FACILITATE WORKSHOP: The facilitator shall actively participate in, and facilitate discussions for the entire workshop, to include set-up activities, 17 Apr 03. Facilitator will maintain pos itive control over the workshop and guide it accordingly when and if tensions should heighten. Facilitator will ensure that ground rules are stated at the beginning of the workshop and adhered to throughout the duration of the workshop. Facilitator will perform a recap at the close of 17 Apr 03. Facilitator will be responsible for issue and collection of a partnering critique. DOCUMENT WORKSHOP: The facilitat or shall provide a minute taker. Facilitator shall further provide documentation of the workshop in MS Word to include capture of the final attendance, key points presented, summary of discussion, action items, resolutions, and critique results. For firm s who wish to provide a proposal based on the requirements, please notify the contract specialist for a more detailed scope of work. The proposal must be submitted by 12:00 Alaska time February 28, 2003 to fax (907)-753-2544, phone (907) 753-2555, Attenti on to: Daniel J. Werkmeister, U.S. Army Corps of Engineers, Alaska District, Contracting Division, or email to: Daniel.J.Werkmeister@poa02.usace.army.mil. Technical Requirements: The contractor would need to develop a comprehensive understanding of the goals, expectations, and issues for the Bassett Army Hospital Replacement Project. The contractor will need to be familiarized with all current issues for al l subsequent partnering sessions. The Government will realize the benefits of first hand knowledge associated with issue development and the establishment of goals. It is estimated that a total of 40 hours review time for each partnering session previously conducted would be required for a new facilitator to review all relative project documentation. This review would be required for the facilitator to develop an understanding of project scope, review previous partnering minutes, and interview/query team me mbers. A comprehensive understanding of these subjects must be obtained prior to the start of the partnering workshop, a reading of the partnering minutes and associated documentation alone will not suffice. All proposals will be evaluated by Price and how they meet the technical requirements for this workshop. Upon completion of the workshop the facilitator shall prepare a draft workshop report in electronic format and provide it no later than 7 days after partnering to the Bassett Resident Office. All comments provided shall be incorporated and a final report shall be provided to all participants via bound hard copy with one set via electronic means, to the Bassett Resident Office, within 21 days after the partnering session. In accordance with the provisions of DFARS 252.204-7004, Required Central Contractor R egistration (Mar 2000) offerors must be registered in the Central Contractor Registration (CCR) database. Lack of registration in the CCR database will make an offeror ineligible for award. Offerors and contractors may obtain information on registration an d annual confirmation requirements by calling 1-888-227-2423 or via the internet at http://www.ccr2000.com. All responsible sources may submit an offer which will be considered. Original Point of Contact Daniel J. Werkmeister, Contract Specialist, Phone 907-753-2555, Fax 907-753-2544, Email Daniel.J.Werkmeister@poa02.usace.army.mil
 
Place of Performance
Address: US Army Corp of Engineers - Alaska - Military Works CEPOA-CT, P. O. Box 6898, Elmendorf AFB AK
Zip Code: 99506-6898
Country: US
 
Record
SN00264250-W 20030226/030224213527 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.