Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 03, 2002 FBO #0244
MODIFICATION

J -- Repapir HU25 Switches and Indicators

Notice Date
7/1/2002
 
Notice Type
Modification
 
Contracting Office
Department of Transportation, United States Coast Guard (USCG), Commanding Officer, USCG Aircraft Repair & Supply Center, HU25, HH65, H60J, C130 or Support Procurement Building 79, 75, 79, 78, or 63, Elizabeth City, NC, 27909-5001
 
ZIP Code
27909-5001
 
Solicitation Number
DTCG38-02-Q-100026
 
Response Due
7/8/2002
 
Point of Contact
Linda Clark, HU25 Contract Specialist, Phone 252-334-5212, Fax 252-334-5427,
 
E-Mail Address
LDClark@arsc.uscg.mil
 
Description
17. This amendment to Solicitation DTCG38-02-Q-100026 is hereby issued to clarify the scope of work that shall be required for this solicitation and provide for separately priced replacement parts as designated herein. NOTE: Firm-fixed prices quoted shall not include pricing for these replacement parts. Revised quotes shall require a separate price for each level of work as described in the statement of work. SCOPE: This Statement of Work (SOW) defines the levels of inspection, repair and overhaul of the Hydraulic Pressure Switch (P/N 1-1213-KB), Triple Gage Indicator (P/N 64845-201-1) and Low Pressure Warning Switch (P/N 1914HJ) which is the basis for a Firm Fixed Price contract with the Coast Guard. Work performed under this SOW shall be performed by a Federal Aviation Administration (FAA) authorized repair center, which has experience in repairing like or similar items. BACKGROUND: The Hydraulic Pressure Switch (P/N 1-1213-KB), Triple Gage Indicator (P/N 64845-201-1) and Low Pressure Warning Switch (P/N 1914HJ) currently installed on the HU25 have a high failure rate. The primary objective of this SOW is to have these components repaired or overhauled in the most economical method and provide the Coast Guard with reliable component and increase mean time between failure. REQUIREMENTS: The contractor shall develop and provide the Coast Guard with a Firm-Fixed Pricing schedule for the following levels of repair In Accordance With (IAW) applicable Component Maintenance Manuals (CMMs) listed in this SOW for the following components: Hydraulic Pressure Switch (P/N 1-1213-KB), Triple Gage Indicator (P/N 64845-201-1) and Low Pressure Warning Switch (P/N 1914HJ) Hydraulic Pressure Switch (P/N 1-1213KB), CMM 29-30-05 Inspect/Repair as necessary. Overhaul consists of inspecting, repairing and replacing major components. Components shall be replaced as necessary. The following parts shall not be included in the firm, fixed, price quote and shall be priced separately: Filter (P/N 1-1087AA01) Restrictor (P/N 1-1087AB00-03) Contact Assembly (P/N 1-1213KB02) Nipple (P/N 1-1087ZE00-02) Tube Assembly (P/N 1-1213-01-1). All components found unserviceable IAW CMM 29-30-05 shall be replaced. Any defects found in the Contact Assembly (P/N 1213KB02 or Tube Assembly (P/N 1-1213-01-1) are not permissible and shall be replaced. The contractor shall completely test the Hydraulic Pressure Switch IAW the test procedures described IAW 29-30-05 upon completion of any work. Triple Gage Indicator (P/N 64845-201-1), CMM 29-30-10 Inspect and repair as necessary. Overhaul: Consists of inspecting, repairing and replacing major components. Components shall be replaced as necessary. The contractor shall completely test the Triple Gage Indicator IAW the test procedures described IAW CMM 29-30-10 upon completion of any work. Low Pressure Warning Switch (P/N 1914HJ), CMM 31-09-03 Inspect and repair as necessary. Overhaul: Consists of inspecting, repairing and replacing major components. Components shall be replaced as necessary. The following parts shall not be included in the firm, fixed, price quote and shall be priced separately: Receptacle Electrical Connector P/N 52.02.E10.6P Arm Assembly, Fixed Contact P/N 1914.AA.03 Arm Assembly, Moving Contact P/N 1914.AA.02 Bellows Assembly P/N 1914.FA.01 The contractor shall completely test the Low Pressure Warning Switch IAW the test procedures described IAW CMM 31-09-03 upon completion of any work. DELIVERABLES -- The Contractor shall provide a Federal Aviation Administration airworthiness form 8130-3 with each component repaired or overhauled. The Contractor shall provide the CG Contracting Officer with a statement describing the work accomplished and parts replaced. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (01-JUL-2002). IT ACTUALLY FIRST APPEARED ON THE FEDBIZOPPS SYSTEM ON 01-AUG-2002. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/DOT/USCG/USCGARSC/DTCG38-02-Q-100026/listing.html)
 
Record
SN00131052-F 20020803/020801222154 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.