Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 08, 2002 FBO #0096
MODIFICATION

93 -- MASSIVE MODULAR BLOCKS - LARGE CONCRETE BARRIERS

Notice Date
3/5/2002
 
Notice Type
Modification
 
Contracting Office
ESC/FDK, Force Protection, 5 Eglin Street, Hanscom AFB, MA 01731-2118
 
ZIP Code
01731-2118
 
Solicitation Number
F19628-02-R-0023
 
Archive Date
9/14/2002
 
Point of Contact
Captain Julio A. Negron, Contract Manager, 781-377-8661
 
Small Business Set-Aside
Total Small Business
 
Description
This announcement serves as notice to all potential offerors that the Force Protection Program Office, Electronic Systems Center, Hanscom Air Force Base, Massachusetts anticipates release of Request for Proposal F19628-02-R-0023 (on or before 15 March 2002) for the acquisition of Massive Modular Blocks (MMB), with delivery FOB Destination. This acquisition is a 100% Small Business Set-Aside (NAICS 327390, Size Standard less than or equal to 500 Employees). The MMB concept is to use large concrete blocks, with steel rebar enforcements, built in accordance with Government specifications, to block access to various storage structures. The blocks will be impossible to move without heavy equipment and cover the entire entrance. The Government anticipates requirements for MMB's at the following eight (8) locations: (1) Shreveport, LA; (2) Kansas City, KS; (3) Minot, ND; (4) Las Vegas, Nevada; (5) Great Falls, MT; (6) Cheyenne, WY; (7) Albuquerque, NM; and (8) Niceville, FL. The contract type will be a firm fixed price with the initial award of approximately six blocks to prove the design, and Option CLINs for each site to be awarded to one or more offerors. The quantity of blocks and site-specific configurations of equipment will be provided in the Request for Proposal. The MMB delivery schedule requires delivery of initial six blocks 45 days after contract award. Phase I delivery of an estimated 1,300 blocks to the eight (8) locations must be accomplished between 45 to 90 days after option exercise, depending on the mix of options exercised by the Government. The contractor must have the capability to produce and deliver this volume of blocks and ancillary installation items (consisting of mats and pins) FOB Destination. The solicitation will be made available, on or about 15 March 2002 on the ESC Business Opportunities Web Page (www.herbb.hanscom.af.mil) linked below. Offerors will have 14 calendar days to submit Past Performance Information and 30 calendar days to submit the Technical/Management Volume and Price Volume. See Note 26.
 
Web Link
ESC Business Opportunities Web Page
(http://www.herbb.hanscom.af.mil)
 
Place of Performance
Address: N/A
Zip Code: N/A
Country: N/A
 
Record
SN00037309-W 20020308/020307125155 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.